EXPERIMENTS

To ensure significant profits, these three tests needed to be performed.  

time.jpg

-- 10 mins installation

Finishing the following step to measure the installation time: 
  1. Checking tools and parts.
  2. Start the timer. Gloves on. 
  3. Mount bike rack, rack arms with 2 screws on the rear wheel frame and 2 screws for bike seat post. 
  4. Chain up motor sprocket by spring hinge, then cassette gear by Master Link. 
  5. Wire up (positive port battery – motor - rocker switch – battery in order). Twine loose wire on bike tube.  
  6. Make sure no obstacle in the way of operation then switch on for smooth chaining movement. 
  7. Stop the timer and record the results. 


5050.jpg

 -- reduce 1/2 pedaling need

Finishing the following steps to verify this functionality:

  1. Select a proper route that less possible accident may happen to change the parameter, a flat and slopes combined route is recommended in order to see critical circumstance this device can overcome.  
  2. Start the timer, finish the route and record the traveling time. The timer can be accomplished by another person for safety issue. 
  3. Check the device is ready and performing another ride for SAME route.
  4. Compare time 1 and time 2 
  5. If time 1 > time 2 = PASS,                                         time 1 < time 2 = FAIL  



willakenzie.jpg

-- 10-mile garantee

Finishing the following steps to measure a full-battery trip:

Simplest and easiest. Spot the beginning by any GPS cell phone and track the finish route of a fully-charged battery can go. Select a proper route that less possible accident may happen to change the parameter, a flat and slopes combined route is recommended in order to see critical circumstance this device can overcome. 

SIMBLAWebsite Builder